Skip to main content
NOTACHEMSHANGHAI · CHINA

Capability is a chain, not a list

Synthesis, process and scale-up are three stages in time, and each can be bought separately. What differs is the handover: where the route stops, where the process is redone, who owns the problem when something goes wrong. At NOTACHEM the three stages share one record set, one project lead and one technical file.

5 g–1 kg
Custom synthesis batch
5 L–10,000 L
Scale-up and production
−78–200 °C
Operating temperature
≤5 MPa
Operating pressure

One team, from route to batch

Most custom projects fail on handover rather than chemistry. The route is proven by one company, redeveloped by a second, and scaled by a third. Each handover means re-explaining the background, and each explanation loses information.

NOTACHEM keeps the three stages, together with the impurity work that supports them, in a single technical file: route assessment, lab batch records, analytical methods and validation data, scale-up parameters and deviation handling — maintained by one project lead. Ask at any stage and you get the current version of the same document.

01

Custom synthesis

The objective is an evaluable compound as fast as possible, not an elegant route on paper. Risk is named at the assessment stage: which step has an unreliable raw material, which will slow down on scale, which carries safety or regulatory obstacles.

Typically 2–4 weeks; complex molecules quoted by step count

We need

  • Target structure or CAS number
  • Quantity and purity requirement
  • Regulatory and documentation needs
  • Target delivery date

You receive

  • Target compound, 5 g–1 kg per batch
  • Structural confirmation by HPLC / LC-MS / NMR
  • Preliminary impurity profile and references
  • Lab batch records
01

Route search and assessment

Literature and patent routes reviewed, two or three candidates returned with step count, estimated overall yield, raw material availability and scale-up risk for each.

02

Problem step resolution

Low-yielding, poorly selective or harsh steps are screened separately — first whether it works, then whether it works well.

03

Intermediate characterization

Every intermediate is confirmed by HPLC purity and LC-MS, with NMR on key steps, so errors do not surface only at the final step.

04

Purification and confirmation

Chromatography, recrystallization or salt formation; the final product ships with HPLC purity, LC-MS mass and 1H NMR, with 13C and 2D spectra where needed.

Where the structure is client intellectual property, a mutual NDA can be signed before assessment, covering the structure, the route and the existence of the project itself.

02

Process development

A route that works on the bench is not a process that runs in a plant. Process development answers three questions: which parameters are critical, how wide the operating window is, and where the impurities come from.

Typically 6–12 weeks depending on impurity complexity and scale steps

We need

  • Existing route or lab batch records
  • Target specification and impurity limits
  • Intended scale and equipment
  • Cost target, if any

You receive

  • Critical process parameter list with robustness data
  • Impurity origin, fate and control strategy
  • Crystallization method with polymorph and particle size data
  • Transferable process package and batch record template
01

CPP identification

Temperature, charge ratio, addition rate, pH and agitation studied singly and, where needed, by design of experiments — defining a design space rather than a single point.

02

Impurity origin and fate

Every known and unknown impurity is traced to a step and a side reaction, then classified as process, degradation or carry-over before limits are set.

03

Crystallization and purification

Solvent screening, anti-solvent and drowning-out crystallization, cooling profile design; polymorph, particle size and filterability examined so filtration does not fail on scale.

04

Process package

Batch record template, mass balance, equipment matching, scale-up risk register and deviation playbook — operable by the receiving team.

Data generated during process development feeds directly into the technical justification of specifications and method transfer.

03

Scale-up & manufacturing

Scale-up is not multiplying the charge. Mass and heat transfer, addition time and mixing efficiency all change with scale; heat evolution and local concentration that were invisible in the lab become safety issues at ton scale.

Scheduled per project; typically 3–6 weeks per batch

We need

  • Process package and batch record
  • Target batch size and delivery schedule
  • Packaging and shipping requirements
  • Quality agreement, if required

You receive

  • Scale-up batches with COA
  • Batch and deviation records
  • Stability and retention arrangements
  • Packaging, labelling and shipping documents
01

Stepwise scale-up

5 L → 50/100 L → 500 L → 1,000 L and above, verifying yield, purity and impurity profile at each step. No skipping levels.

02

Train matching

Borosilicate glass, glass-lined steel, 316L stainless and Hastelloy C-276 selected according to corrosivity and metal sensitivity of the system.

03

Hazardous chemistry control

Hydrogenation, cryogenic, anhydrous and strongly exothermic reactions are assessed separately: reaction calorimetry, gas evolution, quench and emergency planning.

04

Batch consistency

Quality data trended across batches. When drift appears, raw materials and equipment are investigated before operations — release is not obtained by retesting.

Partner plants operate under GMP systems. NOTACHEM owns technical, quality and documentation consistency; site audits can be arranged in advance.

04

Impurity research & standards

The question about an impurity is not how much was detected but whether anyone knows what it is. A 98% batch with a mapped impurity profile is more useful than a 99.5% batch with an unknown one — the first tells you which impurities the next step will purge.

Standards 3–6 weeks; method development and validation 4–8 weeks

We need

  • Target molecule and known impurity list
  • Existing route or batch data
  • Target or in-house limits, if any
  • Reference standard quantity and grade

You receive

  • Theoretical impurity map with origin assignment
  • Impurity reference standards, mg to g, with structure elucidation
  • Forced degradation study and degradation pathways
  • Related-substance, chiral and residual-solvent methods with validation data
01

Impurity mapping

Process impurities, carry-over impurities and degradation products are derived from the route and reaction mechanism, each listed with structure, originating step and a proposed limit.

02

Forced degradation

Acid, base, oxidation, light and heat applied to establish degradation pathways, separating process impurities from degradants — the two need different control strategies.

03

Reference standards

Target impurities isolated from reaction liquors or degradation mixtures, purified by preparative chromatography and confirmed by NMR and HRMS, delivered with spectra, purity and lot number.

04

Method development and transfer

HPLC related-substance, chiral and GC residual-solvent methods developed and assessed for specificity, linearity, accuracy, precision and detection limit, with two-analyst verification on transfer.

Standards ship with purity, elucidated structure and lot number; validation is delivered as a report suitable for setting in-house specifications and transferring methods.

Chemistry

Reactions we run at scale

The following have been validated through scale-up, not merely attempted on the bench. Typical systems and the specific scale-up considerations are listed.

Asymmetric hydrogenation
Ru / Rh / Ir with chiral phosphine ligands
ee and turnover optimised together; hydrogen distribution and mass transfer on scale
Air- and moisture-sensitive
Grignard, organolithium, LDA, borane reductions
Schlenk line and glovebox work; addition order and local overheating on scale
Metal-catalysed coupling
Pd / Cu / Ni: Suzuki, Buchwald–Hartwig, Negishi
Ligand and catalyst loading; palladium residues and work-up on scale
High pressure
Pressure hydrogenation, carbonylation, amination, ≤5 MPa
Reaction calorimetry and relief design; safety assessment mandatory before scale-up
Cryogenic
Directed deprotonation with n-BuLi or LDA at −78 °C
Cooling capacity matched to addition rate; local concentration control
Oxidation & halogenation
TEMPO / hypochlorite, mCPBA, NBS / NCS
Heat evolution and by-product control; quench strategy drives both yield and safety
Protection & deprotection
Silyl ethers, Boc / Cbz / Fmoc, acetals and ketals
Selectivity in polyfunctional molecules; deprotection conditions affecting the final product
Salt formation & polymorphism
Hydrochloride, sulfate, sodium and organic acid salts
Salt screening, solvent system and cooling profile; particle size affects filtration and flow

Equipment

Reactors and operating envelope

Volumes from 5 L to 10,000 L, four wetted materials selected by corrosivity and metal sensitivity, with temperature and pressure ranges covering routine and demanding conditions.

Volume
5 L / 50 L / 100 L / 500 L / 1,000 L / 5,000 L / 10,000 L
Wetted materials
Borosilicate glass · glass-lined steel · 316L stainless · Hastelloy C-276
Temperature
−78 °C to 200 °C
Pressure
Atmospheric to 5 MPa (hydrogenation vessels)
Agitation
Anchor, paddle, turbine, with gas sparger options
Utilities
Metered addition, reflux with water separation, distillation, off-gas scrubbing, centrifuge and drying

Analytics

Data behind every batch

Analysis is not a final formality before shipment; it is the basis for decisions across route, process and scale-up.

HPLC
Assay, purity, related substances
Chiral HPLC
Enantiomeric excess and chiral purity
GC / GC-MS
Residual solvents, volatile impurities
LC-MS
Mass confirmation, impurity structure assignment
NMR (400 MHz)
Structural elucidation, 1H, 13C and 2D
Karl Fischer / melting point / optical rotation / residue on ignition
Routine physical chemistry

Project management

How a project is kept under control

Four mechanisms that remove the "where are we?" conversation.

One project lead

A single owner accounts for technical work, timeline and documentation towards the client. No hand-offs.

Stage sign-off

Deliverables are submitted and confirmed in writing before the next stage begins, so a wrong direction is not amplified at scale.

Dual-signature change

Changes to route, raw material source, critical parameters or methods require both technical and client confirmation.

Version-controlled documents

Batch records, methods and COAs carry version numbers and dates. Historical versions remain traceable; no verbal revisions.

FAQ

Questions we are asked most about capability

What is the minimum order quantity?

Catalogue products start at 5 g. Custom synthesis typically starts at 10 g. Scale-up and commercial batches depend on the molecule and process, usually from kilogram scale.

Can we commission a route assessment only?

Yes. Route assessment and a feasibility opinion can be commissioned on their own, delivered as a written report. Whether to proceed to production is your decision.

What exactly is in a process package?

Batch record template, mass balance, critical parameters and operating windows, impurity profile with recommended limits, equipment requirements, scale-up risk register and a deviation playbook.

Can scale-up happen in our own plant?

Yes. We supply the process package and on-site technical support against milestones, or complete scale-up ourselves before transferring the whole process.

How is confidentiality handled?

Structures and process information are client assets. A mutual NDA can be signed before assessment; documents are returned or destroyed at project close and are not reused for our own product development.

More questions →

Start with a structure

Send a structure and target quantity; feasibility, timeline and indicative pricing follow within one business day. A route discussion alone is also fine.

Capabilities · Custom synthesis, process development, manufacturing | NOTACHEM